• ISO 9001Certification
  • 24/7Service
  • QualifiedProfessionals

Steel building grounding Mike Holts Forum

  • Description:Steel building grounding Mike Holt's ForumNov 06, 2008Grounding for Steel Building Structure Install a driven ground rod at base of each corner column and at intermediate exterior columns at distances not more than 60 feet (18 m) apart. I am not sure which code requires that or it is a kind of commen practice.Building Stee ...
  • Standard:ASTM, ASME, AISI, GB, JIS, DIN, EN, BS
  • Certification:ISO, SGS, RoHS, CE, IBR
  • Production Capacity: 50000 tons Per Month
  • Email: [email protected]
Online Chat Leave a Message

Steel building grounding Mike Holts Forum Description

Steel beams bonding Mike Holt's Forum

May 15, 2010250.104(C) Structural Metal. Exposed structural metal that is interconnected to form a metal building frame and is not intentionally grounded and is likely to become energized shall be bonded to the service equipment enclosure, the grounded conductor at the service, the grounding electrode conductor where of sufficient size, or the one or more grounding electrodes used. What are the requirements for grounding and bonding?What are the requirements for grounding and bonding?250.4 General Requirements for Grounding and Bonding. (A) Solidly Grounded Systems. (1) Electrical System Grounding. Electrical power systems, such as the secondary winding of a transformer are grounded (connected to the earth) to limit the voltage induced by light- ning, line surges, or unintentional contact by higher-voltage lines.ARTICLE 250 Grounding and Bonding What is grounding metal?What is grounding metal?Grounding metal parts helps drain off static electricity charges before flashover potential is reached. Static grounding is often used in areas where the discharge (arcing) of the voltage buildup (static) can cause dangerous or undesirable conditions [500.4 Note 3]. DANGER:ARTICLE 250 Grounding and Bonding

What is static grounding used for?What is static grounding used for?Authors Comment Grounding metal parts helps drain off static electricity charges before flashover potential is reached. Static grounding is often used in areas where the discharge (arcing) of the voltage buildup (static) can cause dangerous or undesirable conditions [500.4 Note 3]. DANGER:ARTICLE 250 Grounding and BondingARTICLE 250 GROUNDING AND BONDING - Mike Holt

58 Mike Holts Illustrated Guide to Understanding 2017 NEC Requirements for Bonding and Grounding 250.4 Grounding and Bonding (5) Effective Ground-Fault Current Path. Metal parts of electrical race-ways, cables, enclosures, or equipment must be bonded together andARTICLE 250 Grounding and Bonding - Mike Holt Mike Holt Enterprises, Inc. MikeHolt 888.NEC.CODE (632.2633) Steel building grounding Mike Holts Forum and structural building steel will become and remain energized. Figure 25011 Steel building grounding Mike Holts Forum the supply source via the effective ground-fault current path. Figures 25012 and 25013 (2) Equipment Grounding. Metal parts of electrical equipment are grounded (connected Steel building grounding Mike Holts Forum

Best way to connect a ground conductor to a steel sided Steel building grounding Mike Holts Forum

Apr 30, 2016Well, touch and step voltages can be dangerous. There's a few things that have to go wrong for it to be a practical concern. A properly installed grounding electrode system is what you should be looking to accomplish. Search "grounding electrode systems" I recommend anything by Mike Holt as an excellent resource but he can be a bit technical.Building Steel Grounding Mike Holt's ForumOct 12, 2014building steel as grounding electrode Mike Holt's ForumAug 10, 2012Grounding to building steel Mike Holt's ForumMar 24, 2010Building steel ground Mike Holt's ForumJul 21, 2008See more resultsGround rod at detached metal building? Mike Holt's ForumNov 05, 2006Dave, you have many options for the grounding electrode system (GES) routing. See 250.64(F). Is the building steel you're referring to structurally holding the building up, or is it a wood structure with steel siding? If it is strucural steel complying with 250.52(A)(2)(1), then no other grounding electrode is required.CHAPTER METHODS AND MATERIALS - Mike Holt 102 Mike Holts Illustrated Guide to 101 Essential NEC Rules Rule 61 300.3 (2) Grounding and Bonding Conductors. Equipment ground-ing conductors can be installed outside of a raceway or cable assembly for certain existing installations. See 250.130(C). Equipment grounding jumpers can be located outside of a

CHAPTER METHODS AND MATERIALS - Mike Holt

102 Mike Holts Illustrated Guide to 101 Essential NEC Rules Rule 61 300.3 (2) Grounding and Bonding Conductors. Equipment ground-ing conductors can be installed outside of a raceway or cable assembly for certain existing installations. See 250.130(C). Equipment grounding jumpers can be located outside of aCode Q&A Grounding and Bonding for Remote Building The grounding of the building/structure disconnecting means to the earth is intended to help in limiting induced voltages on the metal parts from nearby lightning strikes [250.4(A)(1)]. The Code prohibits the use of the earth to serve as an effective ground-fault current path [250.4(A)(5) and 250.4(B)(4)].Code Q&A Metal Frame as Grounding Electrode EC&MMike Holt. Jun 07, 2012. Q. What does the Code require in order to use a metal frame of a building as a grounding electrode? A. The metal frame of a building/structure can serve as a grounding electrode when it meets at least one of the following conditions [250.52(A)(2)]:

Code Q&A by Mike Holt - Electrical Contractor

Mike's Comment When a ground rod is installed for a communications system (your question), it must be bonded with a No. 6 copper or larger bare or insulated conductor to the grounding electrode system at the building or structure served.Electrician TalkElectrician Talk Since 2007 A forum community dedicated to professional electricians, contractors, and apprentices for residential and commercial work. Come join the discussion about trade knowledge, tools, certifications, wiring, builds, scales, reviews, accessories, classifieds, and more!GROUND ROD REQUIRED???? - Mike Holt Code ForumMar 03, 2002Mike, The inspector is correct. If you have a code book look at 250-32(a). Don(resqcapt19) IP 198.5.155.132. Member Name Email [email protected] Location NorthCarolina Title Maintenance In Trade Since 84 Registered Oct 2000 Total Posts 20 posted February 27, 2001 at 01:46 PM

GROUND ROD REQUIRED???? - Mike Holt Code Forum

Mar 03, 2002Mike, The inspector is correct. If you have a code book look at 250-32(a). Don(resqcapt19) IP 198.5.155.132. Member Name Email [email protected] Location NorthCarolina Title Maintenance In Trade Since 84 Registered Oct 2000 Total Posts 20 posted February 27, 2001 at 01:46 PMGrounding Do's Don'ts & Why Part 2 Page 4 QRZ ForumsMar 03, 2012If your tower is constructed using a concrete blocks in the ground to support it, all you need to do is bond the anchor bolts and reinforcement steel, then bond a minimum #6 AWG jumper to the reinforcement steel to tag a leader out to be bonded to the rest of the GES.Grounding Do's Don'ts & Why Part 2 Page 4 QRZ ForumsMar 03, 2012If your tower is constructed using a concrete blocks in the ground to support it, all you need to do is bond the anchor bolts and reinforcement steel, then bond a minimum #6 AWG jumper to the reinforcement steel to tag a leader out to be bonded to the rest of the GES.

Grounding Do's Don'ts & Why Part 2 QRZ Forums

Feb 28, 2012I know him from another forum (Mike Holt's NEC code forum for professionals, not amateurs ) Hopefully he will stick around here to become a regular. The other forum is the very best forum on the planet for the electrical profession and the owner of the site is the author of perhaps the most popular NEC code update classes in existence.Grounding Do's Don'ts & Why Part 2 QRZ ForumsFeb 28, 2012I know him from another forum (Mike Holt's NEC code forum for professionals, not amateurs ) Hopefully he will stick around here to become a regular. The other forum is the very best forum on the planet for the electrical profession and the owner of the site is the author of perhaps the most popular NEC code update classes in existence.Grounding Pole Building Sheet Metal? - Electrical - DIY Steel building grounding Mike Holts ForumJul 08, 2007Structural metal. If exposed structural metal that forms a metal building frame is likely to become energized, you must bond it to (Fig. 3) one of these [250.104(C)] Service equipment enclosure; Grounded neutral service conductor; Grounding electrode conductor, if sized per Table 250.66; One or more of the electrodes of the grounding electrode Steel building grounding Mike Holts Forum

Grounding Quiz, by Mike Holt - ECN Electrical Forums

May 07, 2005Grounding Quiz By Mike Holt When answering these questions it very important that you base your answers on the following terms as defined by the 2005 National Electrical Code. Bonding (Bonded). The permanent joining of metallic parts to form an electrically conductive path that ens Steel building grounding Mike Holts ForumGrounding Quiz, by Mike Holt - ECN Electrical ForumsMay 07, 2005Grounding Quiz By Mike Holt When answering these questions it very important that you base your answers on the following terms as defined by the 2005 National Electrical Code. Bonding (Bonded). The permanent joining of metallic parts to form an electrically conductive path that ens Steel building grounding Mike Holts ForumGrounding rod connection from Steel building grounding Mike Holts Forum - InterNACHI® ForumJul 28, 2007From the point 60 inches where the pipe enters the building to the point where there is120 inches of pipe covered outside is the electrode which gives a total of not less than 180 inches of metal pipe that is part of the metal pipe electrode. In the Holt slide the Grounding Electrode Conductor comes from the panel and is landing on the interior Steel building grounding Mike Holts Forum

How to Prevent Unathorized Use of an Outdoor Outlet Box

Preventing the unauthorized use of an exterior outlet is easily accomplished with outlet covers that are lockable. The latest National Electrical Code rules, 406.8(B) Wet Locations, requires exterior outlets to have a cover that can close with a cord plugged into the outlet.Installing Wires Is Conduit Necessary? DoItYourselfAnother benefit is the grounding properties of metal conduits. Depending upon your local regulations, you may be able to use the conduit to serve as the grounding path. Some localities require that a green grounding wire also be used. Check your regulations before proceeding.John Varvatos Designer Men's Fashion Free ShippingShop John Varvatos designer men's clothing, men's shoes, men's accessories, speaker & box sets and more.

Mike Holt - InterNACHI® Forum - InterNACHI® Forum

Apr 17, 2012AFCI Questions and Answers By Mike Holt Would it be possible for you to give more information on how the tests were conducted? A typical receptacle installed in a metal and nonmetallic box mounted on wood studs with drywall. The hot wire just touching the screw on the receptacle, it was move around so that it began a very small arc when the 1,500W heater load was on.Mike Holt Separate Buildings and Structures (4-26-2K)Jan 01, 2011Mike Holt worked his way up through the electrical trade from apprentice electrician through electrical contractor, to become one of the most recognized experts in the world as it relates to electrical power installations. He was a Journeyman Electrician, Master Electrician, and Electrical Contractor. In 1974, Mike realized there was a need for quality electrical training and opened Mike Holt Steel building grounding Mike Holts ForumMike Holt's ForumMike Holt's Forum. Menu. Home. Forums. New posts Search forums. What's new. New posts. Log in Register. What's new Search. Steel building grounding Mike Holts Forum Bonding and Grounding. Threads 7.9K Messages 85.5K. Threads 7.9K Messages 85.5K. Grounding and bonding. 5 minutes ago; Dennis Alwon; Hazardous (Classified) Locations. Threads 2.3K Messages 14K.

NEC Questions and Answers - by Mike Holt (2)

Listed flexible metal conduit is suitable as an equipment grounding conductor if the circuit conductors contained in the conduit are protected by overcurrent devices rated at 20 amperes or less and the combined length of flexible metal conduit in the same ground return path does not exceed 6 ft [250-118(6)]. Figure 2.People also askWhat do you need to know about building steel?What do you need to know about building steel?If the building steel is all connected you need to bond the building steel to the grounding electrode for the building. 3. Additionally bonding might be required as part of lighting protection systems. OK, Let's assume that the steel structure has every steels connected with each other and the building has 100 steel columns.Steel building grounding Mike Holt's ForumResidential grounding The Building Code ForumJan 04, 2017E3608.1 Grounding electrode system. All electrodes specified in Sections E3608.1.1, E3608.1.2, E3608.1.3, E3608.1.4 E3608.1.5 and E3608.1.6 that are present at each building or structure served shall be bonded together to form the grounding electrode system.

Steel building grounding Mike Holt's Forum

Nov 06, 2008Grounding for Steel Building Structure Install a driven ground rod at base of each corner column and at intermediate exterior columns at distances not more than 60 feet (18 m) apart. I am not sure which code requires that or it is a kind of commen practice.The Importance of Nancy Holt, the Woman Who Sep 26, 2017For one minute, at 9:32 a.m., shadows from large concrete spheres meant to resemble dead stars and metal poles align with etchings in the ground. In Sightlines, Holt spoke of Transformer Installation - Mike Holt EnterprisesMay 16, 2002By Mike Holt for EC&M Magazine Steel building grounding Mike Holts Forum within 5 ft from the point of entrance into the building. Exception The grounding electrode conductor can terminate at any point on the water pipe system for industrial and commercial buildings where (1) conditions of maintenance and supervision ensure that only qualified persons service the installation, and Steel building grounding Mike Holts Forum

Transformer Installation - Mike Holt Enterprises

May 16, 2002By Mike Holt for EC&M Magazine Steel building grounding Mike Holts Forum within 5 ft from the point of entrance into the building. Exception The grounding electrode conductor can terminate at any point on the water pipe system for industrial and commercial buildings where (1) conditions of maintenance and supervision ensure that only qualified persons service the installation, and Steel building grounding Mike Holts ForumTransformer Theory Question - Mike Holt Code ForumJan 18, 2003Mike Holt Code Forum Archives Transformer Theory Question register my profile Steel building grounding Mike Holts Forum I always thought the reason for grounding to the building steel was to make the new guy drill through building steel with a cordless drill and a 1/2 bit. IP 64.12.96.73 Steel building grounding Mike Holts Forum Mike Holt Enterprises, Inc. Steel building grounding Mike Holts Forumbonding metal building siding Mike Holt's ForumJul 07, 2014It took the top 8-10' off the chimney - blew it to the ground. Other damage was the rain gutters were on the ground directly beneath where they had been installed - It blew the spikes out of the ferrels. And the last of the damage was sheetrock screws popped in the area of the master bedroom closest to the chimney on the 2nd floor.

grounding pole building sheet metal? DIY Home Steel building grounding Mike Holts Forum

Jul 08, 2007This rule doesn't require you to bond sheet metal framing members (studs) or the metal skin of a wood frame building , but doing so is a good practice. Size the bonding jumper for the structural metal per Table 250.66, based on the feeder or service conductors that supply the building (or steel building grounding mike holt's fmike holt grounding and bondinggrounding building steelmike holt grounding and bonding pdfsteel building grounding system designSome results are removed in response to a notice of local law requirement. For more information, please see here.steel building grounding mike holt's fmike holt grounding and bondinggrounding building steelmike holt grounding and bonding pdfsteel building grounding system designSome results are removed in response to a notice of local law requirement. For more information, please see here.Mike Holt's ForumMike Holt's Forum. Menu. Home. Forums. New posts Search forums. What's new. New posts. Log in Register. What's new Search. Steel building grounding Mike Holts Forum Bonding and Grounding. Threads 7.9K Messages 85.5K. Threads 7.9K Messages 85.5K. Grounding and bonding. 5 minutes ago; Dennis Alwon; Hazardous (Classified) Locations. Threads 2.3K Messages 14K.

steel building grounding mike holt's f

mike holt grounding and bondinggrounding building steelmike holt grounding and bonding pdfsteel building grounding system designSome results are removed in response to a notice of local law requirement. For more information, please see here.Mike Holt's ForumMike Holt's Forum. Menu. Home. Forums. New posts Search forums. What's new. New posts. Log in Register. What's new Search. Steel building grounding Mike Holts Forum Bonding and Grounding. Threads 7.9K Messages 85.5K. Threads 7.9K Messages 85.5K. Grounding and bonding. 5 minutes ago; Dennis Alwon; Hazardous (Classified) Locations. Threads 2.3K Messages 14K.

20 YEARS OF EXPERIENCE IN STEEL PRODUCTION

Our Factory Workshop

Steel Plates Production Line
Steel Plates Production Line
Steel Plates Production Line
Steel Plates Production Line
Steel Pipes Production Line
Steel Pipes Production Line
Steel Coils Production Line
Steel Coils Production Line
Steel Plates Warehouse
Steel Plates Warehouse
Steels Machining Center
Steels Machining Center
Steel Deep Processing Center
Steel Deep Processing Center
Cutting and welding center
Cutting and welding center

Contact Information

  • 118 Kexue Road, Zhengzhou City, Henan Province, China
  • [email protected]
  • 0086-13569929107

Opening Hours

  • Monday / Tuesday 8:30 AM to 6:00 PM
  • Wednesday / Thursday 8:00 AM to 6:30 PM
  • Friday / Saturday 8:30 AM to 7:00 PM
  • Sunday Close

Get in Touch With Us

Complete control over products allows us to ensure our customers receive the best quality prices and service. Your email address will not be published.

Henan Black Iron Pipes Factory

Our Main product included Steel Plates, Steel pipes, Steel coils, Steel Section and Steel sheets, which are largely sell to Europe, South and North America, Asia, Africa, Middle-east, Southeast Asia.

Headquaters

  • 118 Kexue Road, Zhengzhou City, Henan Province, China
  • [email protected]
  • 0086-13569929107
  • 0086-13569929107

Leave a Message

If you have any need steel products, please leave you message.

* Don't worry, we don't spam.